What we did this Saturday

Written by karen on July 18th, 2009

We got all 32 I-joists up today.

The joists arrived on a truck on Tuesday. (Thank goodness they brought a forklift…unlike the panel folks…video of the cool 4WD forklift to come.)

Before we put up the I-joists (beams that span the width of the house to hold up the roof), Brad put up a 2×6 sill on top of the panels. He also had to level it a bit with a belt sander to even things up. (The panels were not all cut perfectly even.)

Then we put up hangers all around the top of the walls.

Then for the joists…First, we had to trim the joists to be the right length. Then we carried them into the house and walked them up a ladder, one end at a time. (They’re quite heavy but manageable. I think we’re both going to be in better shape at the end of this all.) The beams dropped into the hangers and were pushed down. A couple were a bit too long and had to be trimmed again on top of the roof. (That was fun.)

There is a slight slope to our roof to allow for drainage. The next step will be to put panels on the roof. Then building a parapet, putting on the roof, windows and doors, etc.

 

Leave a Comment