This reminds me of a joke about a couple of gorillas and a missing check, but I digress…
I’d like to have used an exclamation point here, but getting this permit has been so tiresome I’m not feeling all that joyful–it’s more of a sigh of relief.
I believe all the hold up has been over what really is a small (but expensive) change to the septic system. After threats of requiring a separate septic system for the main house, they agreed to increasing the size of the leach field by one third as the fix.
As soon as I see the permit, I will schedule an inspection for the existing slab. It’s been quite awhile since Karen and I dug those holes. They have served another purpose in the meantime though; anytime someone asks how hard it is to dig here, I point to the holes and say that Karen and I each dug one in a couple of hours.
Wagons ho!
We may be the first people in history who get a building up in the same or less time than it took to get the permit.
Congrats!