Back in December, a friend of ours said he was getting rid of a small greenhouse and asked us if we wanted it. “Sure,” we said, especially with all the recent damage to our gardens from critters. A more sheltered environment sounded very appealing.

So in January, we went out to move this greenhouse. It was a very cold and windy day, and the greenhouse didn’t come down easy. It clearly wasn’t meant to be disassembled and reassembled. Also, the plastic material in the panels was beginning to fall apart. (Not coincidentally, the greenhouse was seven years old, which was the duration of the warranty.) The sound of the plastic panels breaking as we did this made me cringe, and by the end of the day, my hands and feet were numb with cold. Even taken apart, the parts barely fit in our truck bed, and we had to drive very slowly partly with Brad in the back.

This was the first of many times, we reconsidered the decision to proceed with this.

As with any construction here, we had to consider high winds, so the first thing we did was plan to pour a partial concrete slab to anchor the greenhouse to so it wouldn’t blow away. We also dug out the whole area that would be the interior beds in the greenhouse so we could filter all the dirt. (This is a standard part of making beds here because of all the rocks in our soil.) We also decided to put wire mesh hardware cloth about 6 inches below the floor of the beds to try to prevent rodents from tunneling in. All of this was quite a bit of work.

DSC_2321

the site before we began

DSC_2437

the dissembled greenhouse (ugh)

DSC_2431

concrete done and screening down

DSC_2436

filtering dirt

Next, we began putting together various pieces of the structure. Of course, being spring, we had some windy days during this and so had to use various bracing and hope for the best.

Along the way, more plastic broke, and it was evident that the roof needed to be completely replaced. We considered several options (the same corrugated polycarbonate material as the original manufacturer, sheet plastic, clear corrugated roofing material, etc.), and ultimately decided to go with clear corrugated. Though it wasn’t cheap, it was easy to work with and seems like it will be very durable. Eventually, we are likely to be replacing the material in the walls as well and may use the same material.

Four months from beginning to end, we finished it this weekend.

One concern we have is that the greenhouse may get too hot and kill what’s growing in it. We installed a new vent to try to forestall this and may put in additional screening and shade cloth as well.

For now, I am very eager to get things growing in here. It’s the time of the year for lots of new little seedlings to go in so the timing is great. Stay tuned for updates.

DSC_2538

finished

DSC_2542

inside, including shelving

DSC_2545

clear new roof

 

2 Comments so far ↓